Corrections & Updates
The public record of what we got wrong.
Every material correction and update is listed here, oldest at the bottom, newest at the top. The Newsroom does not quietly rewrite posts.
A correction is issued when a factual claim was wrong. An update is issued when the post has new material information that changes the picture. A clarification is issued when the wording was ambiguous enough that a reasonable reader could have drawn the wrong conclusion.
To report an error, write press@gluearrow.com with the post URL and the specific claim in question. Every message is read by an editor.
Log
- April 20, 2026updateThe licensing rail — stations pay us, we pay the artists.
The original post framed the settlement as 'the detection is the invoice' — implying a fixed per-detection payout. The royalty engine was refactored on the same date into a pooled / proportional model, in which each qualifying detection is a unit and each unit receives a share of the pool funded in that period. Nothing is owed that was not collected first. See A play is a unit for the updated accounting.